See below some of the work completed by the MLN maintenance team during July 2022.
Note: we continuously add more updates during the month, with the latest updates at the top of the page.
Whenever we have a windy evening, it causes a lot of work for the maintenance team to clear the pool and surrounding areas of debris from the surrounding trees!
↓
Trim for a Carob tree that was causing problems with the telephone lines!
↓
The pictures below show the before and after of a freshly painted stairway
↓
The maintenance team added some cement to "sure-up" one of the communal walls
↓
Painting and staining the railings
↓
Trimming an Olive Tree
↓
Staining the benches around the pools
↓
Installing some new irrigation!
↓
Trimming of the trees around the lower pool
↓
One of the points raised at the 2022 AGM was to provide shade at the lower pool since the main tree providing shade was cut back. Below pictures show the maintenance team installing the new shade umbrellas. They have been set in concrete to avoid problems in the windy season!
↓
The picture below shows the maintenance team making repairs to the sun loungers. Several sun loungers they could not repair & on one, somebody had removed un-replaceable parts (we presume to fix a sun lounger at home). This means some now need to be replaced. Please be careful with the sun loungers; they are a community asset.
↓
The video and picture below show the maintenance team doing some metal work to fix the door on an electric meter
↓
Three short videos below highlight some of the frequent and hard to detect water leaks on MLN. After the videos are pictures of the repair process carried out by the maintenance team.
↓
Before and after shots of scrub clearing/gardening the the uppermost area of MLN
↓
The Picture below show the cleaning of some drainage areas
↓
The before and after pictures show the clearing of scrub above Casa Pamela
↓
The picture below shows a fire risk area that was cleared in the upper part of MLN
↓